Every software company needs a roadmap at some point. The reasons vary, but the end result is the same: a meticulously crafted Gant chart-esque masterpiece. Which everyone in the organization then proceeds to rip apart.

To prevent endless back and forth and mitigate the effect of shiny new things or strong opinions, here is a a framework that has saved me time and grief.

All roadmaps are a Value/Effort calculation overlaid on existing resource capacity.

Effort

Effort is generally the easier part of the equation to figure out. A good PM should have a sense of this, but Engineering ultimately confirms this . For Effort, I like to use simple T-shirt sizing, with the following numeric values for sizes:

S=2

M=4

L=6

XL = 8

XXL = 13

These numeric values roughly correspond to weeks in a quarter. I generally aim to cap out team capacity at an 8. In other words, if the team is taking on an XL this quarter, they should not have any other major goals.

The other powerful tool this unlocks is the ability to say: "The current plan has the dev team at 150% of capacity next quarter." By making the constraints clear upfront, when (not if) the team misses a goal because of ambitious planning, we can skip the retro.

Next post, we'll dig into the trickier part: Value.